Two energy reporting regimes land on the same desks in most large organisations. SECR is annual and sits in the directors' report. ESOS runs in four-year phases with a growing set of follow-up duties. Two ESOS dates fall in December 2026: 5 December for Phase 3 progress updates and 31 December for Phase 4 qualification.

SECR: what goes in the report

Streamlined Energy and Carbon Reporting has applied to reports for financial years starting on or after 1 April 2019. It is set out in the Companies (Directors' Report) and Limited Liability Partnerships (Energy and Carbon Report) Regulations 2018. It applies to quoted companies, large unquoted companies and large LLPs. The government encourages other organisations to report in a similar way, but for them it is voluntary.

For a large unquoted company, the directors' report must include:

  • UK energy use in kWh, covering gas, electricity and transport fuel
  • emissions in tonnes of CO2e from gas combustion and transport fuel, and from purchased electricity, including for transport
  • at least one ratio expressing emissions against a quantifiable factor of the business
  • the methodologies used to calculate the figures
  • a description of the principal measures taken to improve energy efficiency in the year, if any were taken
  • the same figures for the previous year, except in the first year of reporting

LLPs put the same information in an Energy and Carbon Report. The government guidance describes the emissions totals as broadly similar to Scope 1 (direct emissions from owned or controlled sources) and Scope 2 (indirect emissions from purchased energy). Fuel used in personal or hire cars on business counts as mandatory transport energy for unquoted companies and LLPs. Wider supply chain emissions are not required.

The intensity ratio is your choice. The guidance gives examples such as tonnes of CO2e per square metre for property businesses and per full-time employee.

Quoted companies report global emissions and must state what proportion of their emissions and energy use relates to the UK and offshore area, along with energy efficiency measures.

There are two exemptions. A company that consumed 40,000 kWh or less in the UK in the period need not disclose, and nor must it where the directors consider disclosure would be seriously prejudicial to the company. In both cases the report has to say so. Where some information is not practical to obtain, the report must state what has been left out and why.

ESOS: the 5 December 2026 progress update

If you took part in ESOS Phase 3 and submitted an action plan, the government's ESOS page states that an annual progress update is due by 5 December 2026. It must be signed off by a board level director (or equivalent) and submitted through MESOS, the Environment Agency's online system.

A progress update has to say whether you implemented each measure in your action plan by the date you set, list any you did not, and estimate the energy savings achieved or expected in the twelve-month reporting period, with the method and data behind each estimate.

ESOS Phase 4: the timeline

Phase 4 guidance was published on 30 July 2026. The key dates are:

MilestoneDate
Qualification date31 December 2026
Compliance period6 December 2023 to 5 December 2027
Notification of compliance5 December 2027
Action plan5 December 2028
First progress update5 December 2029
Second progress update5 December 2030

Section 13.1 of the guidance also says that from Phase 4 onwards a third progress update is due 12 months after the second, by 5 December 2031. The summary table elsewhere in the same guidance mentions only 2029 and 2030, so check the current text before you plan around it.

An organisation qualifies if, on 31 December 2026, it employs 250 or more people, or has annual turnover above £44 million and a balance sheet total above £38 million.

Energy consumption is measured over a reference period of 12 consecutive months that must include the qualification date and end before the compliance date. The calendar year 2026 is one period that fits. Your compliance routes must cover at least 95% of total energy consumption, and you need a lead assessor unless an exemption applies.

What has changed for Phase 4

A few points stand out. Display Energy Certificates and Green Deal Assessments are no longer accepted as compliance routes, although they can still be used as data for energy intensity ratios. The Environment Agency will publish each participant's total energy consumption. The ESOS report must include a review of the previous action plan, identifying measures not implemented and explaining why. Each recommended measure must be assigned an energy saving category, and the earlier provisional requirement to give a payback period has been removed.

The evidence pack must now be kept until 5 December 2035.

Penalties

The guidance sets fixed penalties of up to £5,000 for failing to notify or to keep records, and up to £50,000 for failing to carry out an energy audit or for a false or misleading statement. Regulators will not take enforcement action for a missing action plan, but such failures will be published by the scheme administrator.

A sensible order of work

Sign off the Phase 3 progress update before 5 December, confirm on 31 December whether you qualify for Phase 4, and lock down a full year of 2026 meter data while it is easy to reconcile. The same data feeds SECR.

This is a summary, not legal advice; check the source documents linked below.

SenseCore prepares SECR disclosure tables and tracks ESOS progress updates in one place.

Sources

More posts
21 November 2026
Awaab's Law and heating: what landlords now have to record
From 30 November 2026, excess cold and excess heat come under Awaab's Law. Here is what the clock lo…
21 November 2026
Heat networks: registering with Ofgem before 26 January 2027
Existing heat networks must be registered with Ofgem by 26 January 2027. Who counts as operator or s…
21 November 2026
EPC C by 2030 for social homes: what the government response says
The April 2026 government response confirmed a two-stage energy standard for social homes in England…